Operational planning.
The procedure and timing of construction are depicted in graphics x called calendar plans, the organization of construction farm on the construction site is depicted on the construction master plan, the methods of production of work on drawings, and the required resources are in the statements or graphs, and all these components are accompanied by an explanatory note.
Separate structures and objects, in turn, within the limits established for them, must have their own plans for the organization of work on their implementation.
The plan of the organization of the work of a separate facility also consists of a calendar schedule of work, construction plan and solving work methods. So, for stone work, breakdown into captures and tiers is shown, a method of feeding brick and solution, the necessary mechanisms and auxiliary devices. Finally, the plan contains the calculation of the required means (labor, materials, etc.) and the timing of their delivery for this object.
The presence of a general plan of organization of work and the plan of organization of work on facilities is a directive that should be executed.
In the process of construction, all the more not one -list, all sorts of deviations from the plan are possible for various reasons; The clarification of the plan is required, its correction, however, to withstand the final time of construction.
Thus, in the process of the entire progress of construction, planning and organizational work should be carried out, which should be in the straightening of the plan and in the struggle for the implementation of the measures planned by the plan.
Planning in the process of construction is called operational planning.