Production base for finishing work
The innovation in the workshop is that chalk is now not dried, does not crash and is not sifted, but is processed right on runners and three -wound sprayers, which significantly increased productivity, without reducing quality. The second innovation – now the waste from washing the containers is not lowered into the sewer, but are used as components for the preparation of putty.
Until 1962. All painting compositions were directed to construction sites in metal cups of 30-40 kg in each. The innovators of the LenotdelStroy trust proposed and developed a mechanized installation for the preparation of a paper irrevocable container in the form of cylindrical containers with a capacity of 8 liters, which are covered with a layer of paraffin or liquid glass and are destroyed after one -time use. Paper containers are used for putty, paste and putty. Such an installation was also introduced in the Glavromstroy and in other organizations.
Practice has shown that it is necessary to have paints in construction organizations. It is estimated that annually this gives saving more than 100 thousand. rub., releases 120 workers and halves the number of cars necessary for the delivery of painting materials to objects.
Vacation and delivery of masking semi -finished products are centralized. There are limit-complex cards for each object, according to which the products of the workshop are released. Per day of management submit applications to the dispatcher of the masking semi -finished product workshop.
The technology for the preparation of plastering solutions in glazinggraduate is different from the generally accepted in other construction organizations. Typically, the solution is prepared directly at the construction sites from lime dough and sand or brought from the central mortar plants. This technology was not suitable for Leningrad conditions, since the lime of the Kikerinsky and Volosovsky factories has small activity and, with the usual banging of such lime, up to 40% goes to waste.